Steel River Water

Steel River Water offers fluid management services; from sourcing water, obtaining permits, arranging the logistics of the transfer, heating and transferring fluid on location, de-watering services, and municipal water diversion.

 

Steel River Water has over 15 years of combined personnel experience and who have completed jobs throughout the province, as well as surrounding provinces. Our specific fluid transfer management training ensures that our team is up-to-date, supplying the best personnel and equipment to work with our customers to achieve safe, on-time and cost effective solutions.

Management Related Experience:

Project Location: Alberta

Distance: 3 km to 45 km waterlines

Total Pump Volume (4 wells): 350,000m3

Job Duration: 18 months

Highlights: Average rates feeding the c-ring 12m3 to 6m3. Submersible cages designed for 6-inch and 10-inch submersible pumps, cages up to AER standards.

Project Location: Alberta

Distance: 15.2 km

Total Pump Volume: 12,000 M3

Job Duration: 10 days

Highlights: 1,000 feet of elevation pumping at a minimum rate of 6 M3 per minute using 2 superheaters.

Project Location: BC

Distance: 10 km

Total Pump Volume: 90,000 M3

Duration: 3 months

Highlights: Pushing up 16″ pipeline feeding storage ponds.

Our Services and Equipment Include:

Fluid Management Systems, People and Services

Personnel

  • Fluid Pump Technicians
  • Fluid Pump Supervisors
  • Labour Crews
  • HD Journeymen Mechanics
  • Fluid Transfer Training Personnel
  • Safety Coordinators
  • Equipment Operators

 

Services

  • Hose Sales
  • Reel and Spooler Sales
  • Pump Sales
  • Fluid Transfer Packages
  • Heating Packages
  • De-watering
  • Frac Support
  • Pipeline Fill
  • Speed Loading
  • Rental Equipment
  • Emergency Pumping
  • Water Consulting
  • Integrity/River Crossing Water Management Support
Fluid Management Equipment
  • 4″, 6″, 8″, 12″ Submersible Pumps
  • 4″ – 12″ Fluid Transfer Pumps
  • 2-kW – 200-kW Generators
  • 12″ Lay Flat Hose
  • 10″ Lay Flat Hose TPU
  • 8″ Lay Flat Hose TPU
  • 6″ Lay Flat Throw Hose
  • 4″ – 8″ Suction Hose
  • 4″ – 8″ Suction Screens
  • Custom Suction Screens for Job Specific
  • 10″ Y BY Pass Manifolds
  • Drop Over Line Crossing
  • Pump Containments
  • Steel Manifolds
  • Speed Load Manifolds
  • Self-cleaning River Screens
  • Flow Meters 10″ – 4″
  • Floating Submersible Cages
  • Whip Checks
  • Hose Deployment Systems
  • 6″ – 10″ Filter Units
  • Compressor / Pigging Systems
  • UpRight Tanks
  • C – Rings
  • Superheaters
  • Skid Steers
Containment Systems
  • Filtration Systems
  • Super Heaters, Indirect Heaters
  • 185 cfm 0 375 cfm Air Compressors
  • C-Rings
  • Upright Tanks
  • Combo Units
  • Steamers
  • Wash Units
  • Trailers
  • Fuel Cells
Testing Equipment and Services
  • Test Trailers
  • Day Trailers
  • Boiler Systems/Super Heaters
  • Pigging Heads/Senders/Receivers/Test Heads
  • Pipeline Filling and Dewatering
  • RoW Water Management Services
  • Filtration Bags
Safety, Environment and Quality Control
  • Comply Works
  • ISN
  • Steel River Water Fluid Management Training

Steel River Water Brochure:

 

NEWIMG_0922
untitled
20160919 Pumps
IMG_0011